【 In-line detection 】 In the western region Φ457 Φ610 Φ426, 714.66 km detection completed smoothly
Recently, we successfully completed the western region Φ457 Φ610 Φ426, 714.66 km inspection length for in-line detection. Before the in-line detection, we first issued the inspection program and field exploration.
In the in-line detection stage, pigging service was carried out, and pigging operations were carried out for several times continuously, so that the solid impurities removed were lower than 5 kg, ensuring the smooth progress of subsequent geometric deformation detection and magnetic flux leakage detection.
In the process of in-line detection, we overcame the problem of inspection multiple pipe diameters together and adopted the method of multiple inspection teams working at the same time. With the coordination and cooperation of multiple inspection teams, we successfully completed the detection.
After the inspection, we issued the inspection report and carried out excavation verification. Issue a complete inspection report after all inspections have been verified. POD up to 90%, POI up to 90%. The customer showed that our excavation was very accurate and recognized our service.
Pipe diameter Φ 457 Φ 610 Φ 426 ; Inspection length 714.66 km.
Factory address:
No. 28, Dadong Road, Hushuguan Town, High tech Zone, Suzhou
Dongyue New Industrial Cluster, Tongchuan District, Dazhou City, Sichuan Province

Factory address:
No. 28, Dadong Road, Hushuguan Town, High tech Zone, Suzhou
Dongyue New Industrial Cluster, Tongchuan District, Dazhou City, Sichuan Province