[Pipeline Inspection] Ф 159 Crude Oil Pipeline Inspection Project Successfully Completed
service content: the pipeline length is 17.2km, the pipeline specification is Ф 159x 6m, and the material is 20#. The main work includes but is not limited to pipeline pigging, deformation detection, high-definition magnetic flux leakage detection, excavation verification and other auxiliary work. According to the inspection report provided by Party B, select points for excavation verification.
Site construction:
it is found that the straight pipe section between the two elbows is too short, and the two elbows are not in the same plane, so the space is distorted.
A new type of magnetic flux leakage detector is developed and customized for this project to make the equipment more passable.
New MA159 magnetic flux leakage detector
excavation verification: verify that defects including metal loss, dents, and splits are consistent with the inspection results.
Factory address:
No. 28, Dadong Road, Hushuguan Town, High tech Zone, Suzhou
Dongyue New Industrial Cluster, Tongchuan District, Dazhou City, Sichuan Province

Factory address:
No. 28, Dadong Road, Hushuguan Town, High tech Zone, Suzhou
Dongyue New Industrial Cluster, Tongchuan District, Dazhou City, Sichuan Province