[Pipeline Inspection] Middle East 168 & 325 Pipeline Inspection Project Successfully CompletedTime of issue : 2025- 04-29
service content: the diameter of the pipeline is 168mm and 325mm, and the total length of the pipeline is 62km. The service content includes pipeline pigging, geometric inspection, axial magnetic flux leakage inspection and circumferential magnetic flux leakage inspection. Before testing, the basic situation of the pipeline shall be understood through the pipeline questionnaire and site survey report provided. After the engineer to the site to do pre-construction preparation, assembly and commissioning of equipment, etc. Finally, pigging and testing are started according to the construction plan developed by the testing center.
-
[Pipeline Internal Inspection] Ф 273 Oil Pipeline Internal Inspection Project Successfully CompletedTime of issue : 2025- 04-29
service content: Pipeline specification Ф 273x 6.3mm, length 30,35km. The work includes but not limited to pigging, deformation detection, magnetic flux leakage detection, excavation verification and provision of relevant auxiliary equipment.
-
[Pipeline Internal Inspection] Ф 457 Oil Pipeline Internal Inspection Project Successfully CompletedTime of issue : 2025- 04-29
service content: the whole pipeline is about 6.25km and the pipe diameter is 457mm. The service content includes auxiliary services such as preliminary exploration, pigging, magnetic flux leakage detection, excavation verification (not less than 5 places), including the provision of auxiliary personnel, detectors and other auxiliary equipment, and the preparation of construction completion report according to Party A's requirements.
-
[Pipeline Inspection] Ф 159 Crude Oil Pipeline Inspection Project Successfully CompletedTime of issue : 2025- 04-29
service content: the pipeline length is 17.2km, the pipeline specification is Ф 159x 6m, and the material is 20#. The main work includes but is not limited to pipeline pigging, deformation detection, high-definition magnetic flux leakage detection, excavation verification and other auxiliary work. According to the inspection report provided by Party B, select points for excavation verification.
-
[Pipeline Internal Inspection] Ф 325/355 Coalbed Methane Pipeline Internal Inspection Project Successfully CompletedTime of issue : 2025- 04-29
service content: pipe length 46.049km, pipe diameter 323.9/355.6, wall thickness 7.1mm, pipe material L360M, design pressure 3.9MPa. Including pipeline condition inspection, pigging operation, geometric diameter measurement, three-axis high-definition Magnetic Inspection, coordination with excavation verification, submission of original pipeline inspection data, pipeline corrosion inspection report, pigging report, pipeline geometric deformation, inspection report, pipeline excavation verification report, pipeline magnetic flux leakage inspection report, pipeline centerline data report.
-
Overseas Project , Φ 1067Time of issue : 2022- 12-13
Recently, in competition with world-class inspection companies, we signed and successfully completed the first project abroad. Before the pipe cleaning and inspection, we issued the plan and carried out field exploration. During the execution stage, pigging service, geometric deformation detection, magnetic flux leakage detection was performed.
-
【Pipeline external detection】 In Eastern China, the medium-high pressure pipeline 300Km project completionTime of issue : 2019- 04-08
Recently, in Eastern China, we successfully completed the medium-high pressure pipeline with 300Km inspection length with our mature external inspection technology.
-
【 In-line detection 】 In the western region Φ457 Φ610 Φ426, 714.66 km detection completed smoothlyTime of issue : 2019- 05-07
Recently, we successfully completed the western region Φ457 Φ610 Φ426, 714.66 km inspection length for in-line detection. Before the in-line detection, we first issued the inspection program and field exploration.
-
【In-line Detection 】 In Eastern China Φ323.9 Φ406, 165 km inspection completed smoothlyTime of issue : 2019- 05-22
Recently, we successfully completed the Eastern China Φ323.9 Φ406, 165km detection length for in-line detection. Before the in-line detection, we first issued the inspection plan and carried out the field survey.
-
【In-line Detection】In Eastern China Φ355 ,35.4Km In-line Inspection Completed smoothlyTime of issue : 2019- 08-26
Recently, we successfully completed the Eastern China Φ 355, 35.4 Km for in-line inspection. Before in-line inspection, we first issued the inspection plan and conducted site survey. In the implementation phase, pigging service, geometric deformation detection and magnetic flux leakage detection were carried out.
Factory address:
No. 28, Dadong Road, Hushuguan Town, High tech Zone, Suzhou
Dongyue New Industrial Cluster, Tongchuan District, Dazhou City, Sichuan Province

Factory address:
No. 28, Dadong Road, Hushuguan Town, High tech Zone, Suzhou
Dongyue New Industrial Cluster, Tongchuan District, Dazhou City, Sichuan Province